top of page

PCH PROJECT

Pacific Coast Highway Engineering project Started September 2014 currently 

- Installed new water main extension for current domestic and fire department use with the capability for future residences. - Installed 3300 lineal ft. of underground wet and dry utilites to all future building sites.

 

bottom of page